Project Update

State Route 32 Widening Project

City Council Consideration of Environmental Impact Report

What is the project?

The City of Chico, in cooperation with the California Department of Transportation (Caltrans), is proposing to widen and improve approximately 2.6 miles of State Route 32 between State Route 99 and Yosemite Drive. The purpose of the proposed project is to provide additional capacity needed as a result of approved and planned development adjacent to the State Route 32 corridor. 

What is the next step?

The City has studied the effects that this project may have on the environment.  The Environmental Impact Report (EIR) identified that the project would result in the following significant and unavoidable environmental impacts:  permanent changes to views and the loss of trees in the short-term until replacement trees mature.  Other project-related environmental impacts would be mitigated to a less-than-significant level with implementation of the recommended mitigation measures.

The 45 day Draft EIR review and comment period commenced on February 25, 2010 and closed on April 12, 2010. Comments received through the public review period of the Draft EIR, associated responses, and the mitigation monitoring and reporting program are included in the Final EIR. The Council will act upon the project and recommended mitigation measures within the EIR defining the ultimate project design.

The Chico City Council will be considering certifying the EIR and approving the SR 32 Widening project at their regularly scheduled July 6, 2010 meeting at 6:30 p.m.  The public meeting will be held at the following location:  

City of Chico Council Chambers

421 Main Street

Chico, CA 95928

Where can I review the Environmental Impact Report?

The EIR will be available for review on June 4, 2010 at City offices on weekdays between 8:00 a.m. and 5:00 p.m.:

City of Chico Municipal Building

Capital Project Services Department – 2nd Floor

411 Main Street; Chico, CA

You may also view and download the EIR from the City’s website at  www.ci.chico.ca.us/capital_project_services/design.asp.

Who do I contact if I have questions?

For more information concerning this project, please contact:

Bob Greenlaw, Senior Civil Engineer

bgreenla@ci.chico.ca.us

530-879-6900

Environmental Impact Report (EIR) :

Final EIR

Part 1 of 4

Part 2 of 4

Part 3 of 4

Part 4 of 4

Draft EIR

Notice of Availability of Draft EIR

Chapter 1 - Cover

Chapter 2 - Title Page

Chapter 3 - TOC

Chapter 4 - Summary

Chapter 5 - Ch 1 Introduction

Chapter 6a - Ch 2 Project Description

Chapter 6b - Ch 2 Project Description

Chapter 6c - Ch 2 Project Description

Chapter 6d - Ch 2 Project Description

Chapter 6e - Ch 2 Project Description

Chapter 6f - Ch 2 Project Description

Chapter 7 - Ch 3 Noise

Chapter 8 - Ch 4 Air Quality

Chapter 9a - Ch 5 Biological Resources

Chapter 9b - Ch 5 Biological Resources

Chapter 9c - Ch 5 Biological Resources

Chapter 10a - Ch 6 Visual Resources

Chapter 10b - Ch 6 Visual Resources

Chapter 11 - Ch 7 Cumulative

Chapter 12 - Ch 8 References

Chapter 13 - Ch 9 Preparers

Chapter 14 - Appendices Flysheet

APPENDICES

Appendix A - NOP Initial Study

Appendix B - Public Workshop Comments

Appendix C - Roundabouts

Appendix D -Mitigation Monitor Plan

Appendix E - Noise Impact Assessment
Appendix F - Arborist Report 01 of 03

Appendix F - Arborist Report 02a1of3 of 03 Appendix A

Appendix F - Arborist Report 02a2of3of 03 Appendix A

Appendix F - Arborist Report 02a3of3of 03 Appendix A

Appendix F - Arborist Report 03 of 03 Appendix B

Appendix G - Delineation of Waters

Appendix H - Natural Environment Study 01 of 14 Cover TOC Exec Summ

Appendix H - Natural Environment Study 02 of 14 Chapter 1

Appendix H - Natural Environment Study 03 of 14 Chapter 2

Appendix H - Natural Environment Study 04 of 14 Chapter 3

Appendix H - Natural Environment Study 05 of 14 Chapter 4

Appendix H - Natural Environment Study 06 of 14 Chapter 5

Appendix H - Natural Environment Study 07 of 14 Chapter 6

Appendix H - Natural Environment Study 08 of 14 Appendix A

Appendix H - Natural Environment Study 08 of 14 Appendix B

Appendix H - Natural Environment Study 09 of 14 Appendix C

Appendix H - Natural Environment Study 10 of 14 Appendix D

Appendix H - Natural Environment Study 11 of 14 Appendix E

Appendix H - Natural Environment Study 12 of 14 Appendix F

Appendix H - Natural Environment Study 13 of 14 Attachment A

Appendix H - Natural Environment Study 14 of 14 Attachment B

Appendix I - Biological Assessment 01 of 11 Cover-ii

Appendix I - Biological Assessment 02 of 11 Pg01-07

Appendix I - Biological Assessment 03 of 11 Pg08-24

Appendix I - Biological Assessment 04 of 11 Pg25-27

Appendix I - Biological Assessment 05 of 11 Pg28-30

Appendix I - Biological Assessment 06 of 11 Pg31-49

Appendix I - Biological Assessment 07 of 11 Appendix A

Appendix I - Biological Assessment 08 of 11 Appendix B

Appendix I - Biological Assessment 09 of 11 Appendix C

Appendix I - Biological Assessment 10 of 11 Appendix D

Appendix I - Biological Assessment 11 of 11 Attachment A

Appendix J - USFWS Biological Opinion

Appendix K - Traffic Report

Appendix L - Historic Property Survey Report 01 of 02

Appendix L - Historic Property Survey Report 02 of 02 Appendices

Appendix M - Prelim Geotech Report

Appendix N - Initial Site Assessment

Appendix O - Hazardous Materials Report

Appendix P - Draft Bridge Design Hyd Report

Appendix Q - Draft Location Hyd Study Report

Appendix R - Storm Water Data Report