header test

For additional information about this project, please contact Craig Murray, Associate Civil Engineer, City of Chico Capital Project Services Department at (530) 879-6931.

For information on projects for bid in the General Services Department please click here: GSD Projects

State Route 32 Widening Project (Phase 1) Project No. 15010 from East of Park and Ride Lot to El Monte Avenue

The work, in general, to be done under this contract consists of roadway widening, pavement rehabilitation and overlay of existing roadway, bridge widening, drainage improvements, signal modifications, soundwalls, steel-backed timber guardrail, landscaping, and all necessary appurtenances, all in conformance with the contract specifications and the details as shown on the contract plans.

PLANS (Full Size)

SR32 P1 Plans 1 of 9

SR32 P1 Plans 2 of 9

SR32 P1 Plans 3 of 9

SR32 P1 Plans 4 of 9

SR32 P1 Plans 5 of 9

SR32 P1 Plans 6 of 9

SR32 P1 Plans 7 of 9

SR32 P1 Plans 8 of 9

SR32 P1 Plans 9 of 9

SR32 P1 Plans Full Set (97 MB)

SPECIFICATIONS

SR32 P1 Specs 1 of 6

SR32 P1 Specs 2 of 6

SR32 P1 Specs 3 of 6

SR32 P1 Specs 4 of 6

SR32 P1 Specs 5 of 6

SR32 P1 Specs 6 of 6

SR32 P1 Specs Full Set (25 MB)

ADDENDUM NO. 1

SR32 P1 Addendum No. 1

SR32 P1 Addendum No. 1-Supplemental Information

ADDENDUM NO. 2

SR32 P1 Addendum No. 2

SUPPLEMENTAL INFORMATION

SR32 P1 Bridge Design Hydraulic Study Report

SR32 P1 Dead Horse Slough As Built

SR32 P1 Deflection Testing and Analysis

SR32 P1 Final Geotechnical Design Report

SR32 P1 Final Materials Report

SR32 P1 Final Material Report Cold Foam Asphalt Mix

SR32 P1 Foundation Report

SR32 P1 Foundation Report Addendum No. 1

SR32 P1 Foundation Report Addendum No. 2

SR32 P1 General X Sections

SR32 P1 SWPPP 1 of 2

SR32 P1 SWPPP 2 of 2

Some of these files are large and may take time to download. Please be patient.